Preempt On‑Site Coordination Conflicts

  • macyadrianmsitipcom

    Member
    07/29/2025 at 6:36 pm

    That concern hit when a previous build stalled over a hidden duct‑beam clash, so a mid‑design audit became essential. Project files went into a specialized service offering a Constructability Review – exactly halfway through design, the team ran clash detection on my BIM model and flagged conduit‑joist conflicts, fire‑stop gaps, and structural clearances. Detailed red‑lined plans and a coordination log arrived next, guiding tweaks to framing sequences and duct routing before permits were issued. Using that expert check meant site crews worked uninterrupted, inspections passed first time, and budgeted timelines stayed intact.